A major civil engineering project that required a thorough geological and geotechnical analysis for the widening of the C-25 road (48 km of alignment). Our technical report was essential to guarantee the safety and feasibility of the foundations along the entire infrastructure.
Analysis of a complex 48 km route to guarantee foundation safety in a large-scale infrastructure project.
A highly accurate technical report that validated the feasibility of the structures, optimized resources and ensured roadway stability.
Years of experience
Geotechnical studies
Write to us with no obligation.