The information study for the Cantabrian-Mediterranean Corridor, Bilbao-Santander section, presented a complex environment due to difficult access conditions and variable geology. The comprehensive campaign included 16 boreholes, 32 trial pits and 7 DPSH tests, all completed within the scheduled timeframe and to the highest quality standards.
Execution of 16 boreholes, 32 trial pits and 7 DPSH tests in a complex environment with difficult access and variable geology.
Execution of the campaign within the agreed timeframe and to the required quality standards, providing complete geotechnical information for infrastructure planning.
Years of experience
Drilling and Borehole projects
Escríbenos sin compromiso